<p>AVK Group</p>
<p>The AVK group has become a member of IAKS</p>
Member of International Association for Sports and Leisure Facilities
EQUIPMENT OF SPORTS FACILITIES
Since 2009
Send request

Swimming pools

Supply and installation of sports and technological equipment, timing and refereeing systems, scoreboards, video screens

Official representative 'Swiss Timing' 'Seicom' 'Malmsten' 'Sportsystem'

Equipment for swimming pools

Weather you need equipment for training and competitions of either amateur or professional level – we have solution for any task. Generally it is recommended to choose equipment that is approved for international competitions – even if the pool is not designated for the Olympic games – as they are suitable for daily use.

The standard length of a competitive pool according to the rules of FINA is 25 or 50 meters. The pool should have 8 or 10 swimming lanes of 2.5 m width each. There are certain rules regarding colours of dividing lines, turning lines and installation of the panels of automatic refereeing equipment. During competitions starting blocks should be equipped with individual starting loudspeakers, sensors of false start and of leg change for relay swimming. This equipment can be removed when the pool is used for therapeutic swimming.

Generally every pool can be considered as «fast» or «slow» depending on its constructional features corresponding the rules of FINA. The construction of the swimming-bath, installation of certain technological and sportive equipment will reduce the water resistance during races enabling swimmers to show best results. These technical features are: optimized depth of the pool, minimization of underwater fl ows, waves overwhelming dividing lines and drips and the use of frontal leaking water starting platforms.

The choice of appropriate technological and sportive equipment for pools allows you to create a «fast» pool even at the design stage.

AVK group supplies the full range of equipment for swimming

- starting blocks;
- dividing lines;
- set of equipment for turning and false start;
- starting platforms;
- training watches;
- clothes and accessories for swimming;
- electronic scoreboards, refereeing and timing systems.

News

Multifunctional sports complex in Ganja officially opened

On April 9, President of the Republic of Azerbaijan Ilham Aliyev took part in the opening of the Ganja Sports Palace

Meeting of the Austrian-Turkmen Society

Management of AVK GmbH took part in the meeting of the Austrian-Turkmen Society

Participation in the exhibition "CAUCASUS: BUILDING&RECONSTRUCTION EXPO 2024"

AVK GmbH took part in the 20th international exhibition "CAUCASUS: BUILDING&RECONSTRUCTION EXPO 2024"

Round table with top officials of Turkmenistan

12.03. the company's management took part in the WKÖ round table with top officials of Turkmenistan