<p>AVK Group</p>
<p>The AVK group has become a member of IAKS</p>
Member of International Association for Sports and Leisure Facilities
EQUIPMENT OF SPORTS FACILITIES
Since 2009
Send request
Official representative 'Swiss Timing' '<p>Malmsten</p>' 'Sportsystem' '<p>Seicom</p>'

Burevestnik swimming pool Kazan, Russia

Kazan, Russia

OPEN - 2011
- 6 000 capacity
- swimming pool
- multi-function sports hall
- gym
- cardio room

The Burevestnik swimming pool was the 24th of 29 venues to be built for the 2013 Summer Universiade. The facility was designed in accordance with International Swimming Federation (FINA) and European Swimming League (LEN) regulations for international-level short course, water polo and underwater swimming events.

AVK GMBH PERFORMED:

- supply and installation of Swiss Timing (Switzerland) scoring and timing systems for swimming and water polo;
- supply and installation of starting platforms;
- supply and installation Malmsten (Sweden) of dividing lanes;
- supply and installation Malmsten (Sweden) of dividing lanes storage trolleys;
- supply and installation of the Malmsten (Sweden) water polo field;
- supply, assembly and installation of swimming pool furniture;
- supply and installation of Malmsten (Sweden) referee catwalks;
- supply of anti-slip swimming pool sidewalks;
- supply and installation of sports and technological equipment for swimming pools.

Do you need sports equipment?
Send a request to our experts.
Rely on the professionals.
News

AVK GmbH: System Solutions for Stable Facility Operation

Why systems matter more than individual components

AVK GmbH: Standards That Define Results

The role of standards in sports infrastructure

Turnkey Solutions: Advantages of a System Approach

Why turnkey solutions are more effective

AVK Engineering: From Concept to Result

Engineering as the foundation of success