<p>AVK Group</p>
<p>The AVK group has become a member of IAKS</p>
Member of International Association for Sports and Leisure Facilities
EQUIPMENT OF SPORTS FACILITIES
Since 2009
Send request
Official representative 'Swiss Timing' '<p>Malmsten</p>' 'Sportsystem' '<p>Seicom</p>'

Centralny stadium Kazan, Russia

Kazan, Russia

OPEN - 1960
- 25 400 capacity
- central stadium
- football and track and field arena

The Stadium Centralny long served as the home for FC Rubin.

The stadium underwent a major renovation in the run-up to the 2013 Universiade. Some rows from the eastern stand were dismantled to make way for a long jump facility. AVK GmbH installed a scoring and timing system from Swiss Timing to ensure the achievements of the athletes at the 2013 Universiade were measured with Swiss precision.

AVK GMBH PERFORMED:

- supply and installation of Swiss Timing (Switzerland) scoring and timing systems for track and field.

Do you need sports equipment?
Send a request to our experts.
Rely on the professionals.
News

AVK GmbH: Standards That Define Results

The role of standards in sports infrastructure

Turnkey Solutions: Advantages of a System Approach

Why turnkey solutions are more effective

AVK Engineering: From Concept to Result

Engineering as the foundation of success